Winter construction precautions
[2017/1/16]   Clicks:[489]
 

Silk edge
For winter construction, the impact of temperature is the primary concern of the entire construction process to ensure the appropriate temperature of construction materials, construction plays an important role in the project! Here to introduce you to the concrete structure, in the winter construction should pay attention to some related matters! Small partners Come Come onlookers it!

 

Precautions

1. For many years the temperature data, the average daily temperature of outdoor 5d stable for less than 5 ℃, the concrete structure works should be taken in winter construction measures; and should promptly take a sudden drop in temperature antifreeze measures.

2. Winter pouring of concrete, concrete in the cold before the compressive strength shall not be less than the following provisions:
⑴ Portland cement or ordinary portland cement concrete prepared for the design of the concrete strength of the standard value of 30%;
⑵ slag Portland cement concrete prepared for the design of the concrete strength of 40% of the standard value, but not more than C10 of concrete, not less than 5.0N / m O.

3. Preparation of winter construction of concrete, should be preferred Portland cement or ordinary Portland cement. Cement strength grade should not be less than 32.5, the minimum amount of cement should not be less than 300kg / m3, water cement ratio should not be greater than 0.6 mixed with antifreeze concrete, high alumina cement is strictly prohibited.

4. Winter pouring of concrete, should use chlorine-free salt antifreeze, to freeze the requirements of high concrete, should use air-entraining agent or air-entraining water-reducing agent.

5. The use of plain concrete, the chloride content of cement shall not exceed 3% of the weight.

6. Aggregates used in concrete must be clean, shall not contain ice, snow and other frozen material and easily cracked minerals. In the mixed with potassium, sodium ion antifreeze concrete, shall not be mixed with active aggregate.

 

7. Mixing Concrete mixed with antifreeze should meet the following requirements:
(1) the preparation of antifreeze solution and antifreeze dosage should be consistent with the relevant provisions of the existing national standards;
(2) strictly control the water-cement ratio of concrete, from the aggregate into the water and antifreeze solution in the water should be deducted in the mixed water;
⑶ stirring before the application of hot water or steam rinse mixer, stirring time should be taken at room temperature mixing time 1.5 times;
⑷ the temperature of the concrete mixture should not be less than 10 ℃, into the mold temperature should not be less than 5 ℃.

8. Concrete in the casting should be removed before the template on the ice and dirt, transport and pouring concrete containers should have insulation measures.

9. Templates and insulation should be removed after cooling the concrete to 5 ℃; when the temperature difference between concrete and the outside is greater than 20 ℃, the concrete surface after demolding should be taken to make it cover the temporary cooling measures.

10. The curing of concrete with antifreeze should meet the following requirements:
⑴ conservation in the negative temperature conditions, non-watering and exposed surface must be covered;
(2) the initial curing temperature of concrete shall not be lower than the specified temperature of antifreeze, fail to reach the required temperature should be taken immediately insulation measures;
(3) concrete mixed with antifreeze, when the temperature drops below the specified temperature antifreeze, its strength should not be less than 3.5N / m O;
(4) When the surface temperature of the concrete after demolding is different from the ambient temperature is greater than 15 ℃, the concrete shall be covered with the heat preservation material.

Reminder
If necessary in the winter construction of the small partners, seize the collection myself! Want to help you!

Jiangsu Silk Fiberglass Fiber Co., Ltd. Mainly used in construction fiber, anti-rutting agent, high-strength polypropylene fiber, high-strength polypropylene twist silk, high-strength polypropylene wire and other products, learn more product details, welcome to our WeChat Oh!


Keywords:    
Relevant:
   Polypropylene engineering fibe    Textile Industry Third-Quarter
   Polypropylene engineering fibe    A brief overview of the operat
   The wide application of polypr    Green and low-carbon, the text
   High-strength polypropylene th    The critical period for the tr
   What are the main uses of poly    Breakthroughs in the research
Top:
Polypropylene monofilament fiber
Polypropyl
Clover polypropylene fibers
Clover pol
Polypropylene fiber works
Polypropyl
Polypropylene Sesi
Polypropyl
Keyword :    
Keyword: 工程纤维 | 高强丙纶丝 | 高强丙纶线 | 聚丙烯纤维 | 聚酯纤维 | 纤维素纤维 | 聚丙烯网状纤维 | 墙衣纤维 | 木质素纤维 | 高强倍捻丙纶长丝 |
Hot link: 龙马色母粒 | 蓝景纳米材料 | 东华纺丝机 | 金彩新材料 | 丝丝缘网上商城 | 浩凯化纤 | 宏特化纤 | 倍联现代物流 |
Address:No. 1 HaiDu North road Sheyang Economic development zone, Jiangsu province TEL:0086-0515-82312319 82312488 FAX:0086-0515-82338366
Copyright 乐发vll500